As part of the reconstruction of a section of a double-circuit 110kV power line from RPZ Wschodnia – PKP Olszynka Grochowska, RPZ Wschodnia – RPZ Grochów and the construction of sections of cable 110kV power lines from RPZ Wschodnia – RPZ Zabraniecka, RPZ Zabraniecka – PKP Olszynka Grochowska as part of the task “Construction of two 110kV cable lines For the purposes of connecting the ZUSOK CHP plant, we built new HV cable lines along with a fiber optic tract. In addition, we reconstructed the overhead line and installed two new cable poles.
The work was carried out to power the Municipal Solid Waste Disposal Plant located in Warsaw at Zabraniecka Street. The investor of this project is Stoen Operator Sp. z o. o.