As part of the task “Construction of 110kV power networks from GPZ Bieżanów-PT Kraków Płaszów and PT Podłęże-PT Kraków Płaszów together with telecommunications networks”, we built over 10 kilometers of HV cable lines and nearly 1.5 kilometers of HV overhead lines. In connection with the construction of the overhead network, we installed nine tubular HV poles for a single-track line and a double-track line. In addition, we installed indoor heads, overhead cable heads and built telecommunications lines (fiber optic).
It took us less than 5 months to complete the entire investment. The work was performed on behalf of PGE Energetyka Kolejowa S.A.